1. Gather the property and vehicle details
A remote assessment can often begin with clear information about the proposed installation. EVision Energy's detailed quote form allows supporting photos and videos to be supplied with the request.
- Vehicle make, model and year
- Exact model of the customer-supplied charger, if already purchased
- Clear switchboard photos, including labels and nearby meter equipment
- The preferred mounting point
- The likely route between the switchboard and charger
- Solar, battery, or existing EV charging equipment
2. Assess electrical and physical suitability
The assessment considers the existing supply, switchboard condition, available circuit space, protective equipment, cable route, mounting surface and environmental exposure. Where demand is constrained, the design may also consider dynamic load management.
Photos are useful, but unusual wiring, long routes or concealed conditions can require an on-site inspection before the scope is finalised.
3. Confirm the charger and installation scope
The proposed charger should be checked against the vehicle's onboard AC charging capability and the property's available supply. This is also the point to confirm tethered or untethered cabling, Wi-Fi or communications requirements, surplus solar charging, access control and future needs.
Read the charger buying guide before purchasing equipment that cannot be returned.
4. Review an itemised quote
A useful quote should identify the charger supply arrangement, dedicated circuit, cable route, protective devices, mounting method, charger setup and any clearly defined exclusions or provisional work. Site conditions outside the supplied information may still change the final scope.
The installation cost guide explains which conditions commonly affect a quote.
5. Installation day
The electrician confirms the agreed charger position and cable route before work starts. The installation may include a dedicated circuit, switchboard protection, cable protection, wall or post mounting, communications wiring and compatible monitoring equipment.
Some drilling, cable access and a temporary interruption to power may be necessary. The duration varies with the route, switchboard work, mounting conditions and integration requirements.
6. Testing, setup and handover
After electrical testing, the charger is set up and checked using the supported manufacturer process. Where applicable, this can include Wi-Fi or network connection, current limits, schedules, access controls, solar modes or load-management settings.
The handover should cover basic operation, cable care, isolation, app setup and account access, warranty information and what to do if the charger or vehicle reports a fault.
What can delay an installation?
- Incomplete switchboard or charger information
- Unexpected cable access or building conditions
- Required switchboard upgrades or supply changes
- Strata, landlord, network or other approvals where applicable
- Unavailable charger hardware or model-specific accessories
- Solar, battery or communications equipment that is not compatible